• Propriety: SOCOCIM INDUSTRIES
  • Engineering: POLYSYUS FRANCE
  • Location: Senegal
  • Year: 2009

Construction project of the structures associated with a cement manufacturing plant with a capacity of 3300 tons / day.

CIVIL ENGINEERING / Calculation of metal structures, detailed engineering and development of fabrication drawings using Tekla Structures (BIM) software: building cement hoppers (600 ton steel), transfer towers, conveyors and storage warehouses for raw materials.

Related Work

HEROES TOWER

Turnkey project of a

JOSÉ SANCHO AUDITORIUM IN MANISES

Construction of an au